Cycling Protocol Using EpiMark™ Bisulfite Conversion Kit (E3318)
Protocol
- Initial denaturation:
95°C 30 seconds
35–40 cycles:
95°C 15 seconds
45–55°C 30 seconds
68°C 1 minute/kb
Final extension:
68°C 5 minutes
To save your cart and view previous orders, sign in to your NEB account. Adding products to your cart without being signed in will result in a loss of your cart when you do sign in or leave the site.